Initial Start-Up - Blodgett KTT-G Series Installation Operation & Maintenance

Gas table top tilting kettle
Table of Contents

Advertisement

IMPORTANT
BE SURE ALL OPERATORS READ,
UNDERSTAND AND FOLLOW THE OPERATING
INSTRUCTIONS, CAUTIONS, AND SAFETY
INSTRUCTIONS CONTAINED IN THIS MANUAL.
WARNING
DO NOT STAND ON OR APPLY UNNECESSARY
WEIGHT OR PRESSURE ON THE KETTLE FRONT
OR POURING LIP. THIS COULD RESULT IN
THE OVERLOAD AND FAILURE OF THE TILT
MECHANISM, AND POSSIBLE SERIOUS INJURY
AND BURNS TO THE OPERATOR AND OTHERS.
Make sure that the open end of the elbow on
the pressure relief valve is directed downward.
Correct water level
8
OM-KTT/KTC-G

Initial Start-Up

After the kettle has been installed, the installer should test to ensure that it is
operating correctly.
1.
Remove literature and packing materials from inside and outside of the unit.
2.
Add water to the kettle to a depth of at least one inch.
3.
Make sure the supplies of gas and electric power are on.
4.
Follow the "To Start Kettle Heating" instructions in the Operation section of this
manual. Begin heating the water at the highest thermostat setting. The indicator
light should come on and heating should continue until the water boils.
5.
To turn off the unit, follow "To Stop Kettle Heating" in the Operation Section of
this manual.
If the kettle functions as described, it is ready for use. If the unit does not operate as
designed, contact an authorized Service Agent.

Advertisement

Table of Contents
loading

Table of Contents