Initial Start-Up

Now that the kettle has been installed, you should test it to ensure that it is operating
correctly.
1.
Remove literature and packing materials from inside and outside of the unit.
2.
Install the TDO valve handle.
3.
Put a small amount of water into the kettle.
4.
Verify that kettle water level is normal and that kettle is holding vacuum in
jacket. Correct if not. (See operating instructions to correct)
5.
Make sure the supplies of gas and electric power are on.
6.
Follow the Start Kettle Heating instructions in the Operation section of this
manual. Begin heating the water at the highest thermostat setting. The indicator
light should come on and heating should continue until the water boils.
7.
To turn off the unit, follow "To Stop Kettle Heating" in "Operating Instructions."
If the kettle functions as described, it is ready for use. If the unit does not operate as
designed, contact authorized Service Agent.
OM-40GS-KLS
9