Subsequently, fix the conductors in the lower end of the supporting tube system by means metal cleats.
For this purpose, the dark grey outer sheath of the
conductor is fixed at the cleat so that the black semiconductive sheath can be contacted (see Fig. 3.1.1a,
page 9 and Fig. 3.1.1b, page 10). Ensure that this black sheath is not damaged. The four
Conductors
are contacted via the cleats fixed at the fixing ring and tightened by means of the eight M6
slotted head screws using a tightening torque of 5 Nm (see Fig. 3.1, page 9 and Fig. 3.2, page 10).
Finally attach the cable ties included in the mounting material to fix the conductors on the supporting
tube.
Note:
An additional connection to the equipotential bonding
system at the lower metal part of the supporting tube
system is not required. The rod clamp at the
air-termination mast 30 (tripod) has no function and
does not have to be connected.
fixing ring
4 x cleat with 4x 2 M6
slotted head screws; 5 Nm
M8 hexagon lock screw;
15 Nm
Fig. 3.1 Air-termination masts 30 with HVI light Conductor
HVI light Conductor
must be removed where the
Publication No. 1637/ UPDATE 07.19 Mat-No. 3003103
9
HVI light
connecting plate
2x M8
hexagon
lock nut
„S"
No electrical,
conductive or earthed
parts may be located
in this adjustment
area, the separation
distance „s" must be
maintained!