Essentials of trial run
9
1. Sequence of trial run
Please conduct trial run as per the
following sequence:
Confirmation of trial run
(When there is abnormality during trial run)
Eliminate improper reason.
Finish.
* Be sure to record the confirmation result before trial run on the Confirmation Sheet 1, 2. This will be the important m
With the installation engineering as the center,
confirm the basic items. The confirmation result
must be recorded in Confirmation Sheet 1, 2.
Strictly carrying out as per the sequence flow of trial run.
After eliminating the improper reason by referring
to the diagnosing method, carry out the trial run
again.
45
: http://splitoff.ru/tehn-doc.html