After installation, trial run must be made to ensure normal operation. Familiarize the user with the use and maintenance through this manual. If the air conditioner is transferred to a new user, this manual should also be transferred. Entrusted installation Installation should be entrusted with after-sale servicemen.
Page 6
Indoor unit installation Troubleshooting Fault codes and reason Fault Phenomenon Reasons code Room-temperature sensor (TA) circuit, including Room-temperat- Running continues ure seasor (TA), indoor PC board Running Indoor heat-exchanger temperature sensor circuit (TC1/TC2), including indoor 93/94 continues heat-exchanger temperature sensor (TC1/TC2) and indoor PC board Indoor fan system, including revolution detecting circuit, indoor fan mo- All stop tor and indoor PC board...
Troubleshooting Confirm and verify When failure occurs, use the remote controller to display the corresponding error code. Checking 1.Press the ì Checkî switch on the remote controller for 1-2 seconds, ì Checkî will appear, and the unit number and the error code will be displayed on the remote controller. 2.The displayed number is the error unit number.
Indoor unit installation Caution To enable normal discharge of water, use drainpipes according to the installation manual. To avoid forming of dewdrops, it must be treated for heat isolation. Inappropriate tubing may lead to water leakage in the room. Requirements: The indoor drainpipe should be treated for heat isolation.
Refrigerant, if meeting with heaters and stoves, etc in the room, may produce hazardous gas. Allowable tube length and allowable height difference Different units have different limits. Refer to the attached manual. Pipe material and size Air conditioner used deoxidized phos-copper (TP Material Model series 072~162 model...
Electrical wiring & Application control Wiring hole Remote controller wiring Application control Set capacity (SW05) Refrigerant piping Vacuum evacuation Evacuate from the outdoor cut-off valve with a vacuum pump. Never use encapsulated refrigerant in the outdoor unit for evacuation. Open all the valves Open all the valves of the outdoor unit.
All the cables shall have got the European authentication certificate. The breaker of the air conditioner should be all-pole switch,and the distance between its two contacts should be no less 3mm.Such means for disconnection must be incorporation in the fixed wiring.