Specification - Clarke CPP2B Operation & Maintenance Instructions Manual

Pressurised paint container
Table of Contents

Advertisement

5. Connect the paint hose (black) from the spray gun to the paint outlet.
6. Ensure the pressure regulator knob is turned fully anticlockwise, then turn on
the air supply from your compressor/air supply to the paint container.
7. Turn the pressure regulator knob clockwise to pressurise the container until
the required pressure is achieved.
• Working pressure will depend upon the consistency of the paint, but
must never exceed 35 psi. If the paint is sluggish at this pressure, it
should be thinned.
8. Turn on the paint outlet valve.
9. Finally, begin spraying and make adjustments to the spray pattern
according to the spray gun instructions.
10. The paint should be agitated by gentle shaking at regular intervals during
use to ensure consistency and avoid colour differences due to the paint
settling in the container.
11. Set the spray pattern and fluid flow using the adjustment screws on the
spray gun.

SPECIFICATION

Container Volume
Air Inlet Connection
Hose Length
Paint Hose Dia
Safety Valve Working Pressure
Weight
Height x Diameter
Parts & Service: 020 8988 7400 / E-mail: Parts@clarkeinternational.com or Service@clarkeinternational.com
2 Litres
¼"BSP
1700 mm
3/8" BSP
35 psi
1.51 kg
322 x 129 mm
7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CPP2B and is the answer not in the manual?

Table of Contents