activTek INDUCT 2000 Manual page 7

Electronic air purification system
Hide thumbs Also See for INDUCT 2000:
Table of Contents

Advertisement

Available languages

Available languages

FIBERGLASS DUCTWORK INSTALLATION (CONTINUED)
5.
Insert (4) 2" threaded bolts into screw holes at
corners of mounting plate. Attach (4) toggle bolt
anchors to ends of threaded bolts.
7.
Insert (4) toggle bolts into 3/8" holes in
duct. Be sure toggle anchors open after
inserting.
9.
Insert unit into opening. Be sure the air
will pass through the ActivePure® Cell
honeycomb matrix.
11.
Plug unit into working power receptacle. Hard wiring unit
into HVAC system should be done by a licensed HVAC
installer or electrical contractor only.
Stud
6.
8.
Center large opening in mounting plate
over 3.5" opening in duct and press plate
to duct. The adhesive gasket will hold the
mounting plate into place. Tighten toggle
bolts - DO NOT OVERTIGHTEN.
10.
Secure the unit to the mounting plate
with (4) thumb nuts.
Remove backing from mounting plate
adhesive gasket.
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Induct 750

Table of Contents