QUICK GUIDE
STEP 4
LEVEL ROOF JACK
Position, level, secure and seal the roof
jack.
STEP 10
REGULATIONS
Read & adhere to the local & national
electrical and plumbing regulations.
STEP 16
COMMISSION THE COOLER
Test the cooler with the MagIQtouch
Controller. Check diagnostics of cooler
electronics. Test the motor.
STEP 22
FINAL CHECK
Test & complete the commissioning
checklist at the end of this document.
STEP 5
CONVEY COOLER
Convey the cooler to the roof.
Note! Always use 2 people when
handling manually.
page 5
STEP 11
ILL922-B
INLET SOLENOID
Fit the solenoid.
Connect the cable.
Connect the
water supply.
Install the drain pipe.
page 7
STEP 17
WATER LEVEL & DRAIN
Set the water level.
Test the drain valve.
page 12
STEP 23
CLEAN UP
Clean up the site!
ILL3388-A
page 15
STEP 6
MOUNT COOLER
Mount cooler to the dropper.
Check pan (reservoir) is level.
page 5
STEP 12
DRAIN VALVE
Fit the drain valve.
Connect the discharge system.
Connect the cable to the cooler
electronics.
page 8
STEP 18
SETTING THE CONTROL METHOD
Set water management method
Set salinity control method.
page 13
STEP 24
CUSTOMER HANDOVER
Show customer how to operate the
cooler. Give them both the MagIQtouch
Controller and cooler owner's manual.
Explain maintenance requirements.
page 15
BREEZAIR EXVQ EVAPORATIVE COOLER INSTALLATION MANUAL |
page 5
A
B
C
D
page 9
E
page 14
page 15
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents