Advertisement

INSTALLATION MANUAL
TBA Evaporative Cooler
(English) (TBA)
Original English Instructions

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Breezair TBA Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Seeley Breezair TBA Series

  • Page 1 INSTALLATION MANUAL TBA Evaporative Cooler (English) (TBA) Original English Instructions...
  • Page 3: Table Of Contents

    WARNING! Failure to install and commission the product in compliance with these instructions, or failure to do the job properly and competently, may void the customer’s warranty. Further, it could expose the Installer and/or the Retailer to serious liability. SEELEY INTERNATIONAL - INSTALLATION MANUAL |...
  • Page 4: Cable Lengths, Standard Wall Control

    CABLE LENGTHS, STANDARD WALL CONTROL TBA Evaporative Cooler...
  • Page 5: Cooler Components

    COOLER COMPONENTS ILL1457-C SEELEY INTERNATIONAL - INSTALLATION MANUAL |...
  • Page 6: Safety Notes

    NOT safe when working with tools recommendations Seeley technical support is not available and and machines. Do not wear loose clothing and decorations the product warranty may be voided.
  • Page 7: Specifications

    SPECIFICATIONS SPECIFICATIONS cont. ELECTRICAL WATER It is a requirement of Seeley International that the electrical Specification: power supply to all coolers is not mixed with other machines or Water Connections : 1/2 inch BSP electrical circuits. Electrical installation must comply with local laws and regulations.
  • Page 8: Components Of The Air Cooler

    COMPONENTS OF THE AIR COOLER LEGEND 1 - Transition (used for the transport base, this becomes the air cooler base for connection to the duct) 2 - Weatherseal (stops air flowing in and out when the air cooler is not operating) 3 - Transition Plug (fitted in the factory) 4 - Cooling Pad Frame...
  • Page 9: Dismantling The Cooler

    If it is difficult to remove, squeeze the clips together and then pull. See diagram. The Transition is now ready to be fitted onto the duct. ILL1154-B ILL987-B SEELEY INTERNATIONAL - INSTALLATION MANUAL |...
  • Page 10: Installing The Transition

    INSTALLING THE TRANSITION INSTALLING THE TRANSITION cont. The air cooler is designed to be fixed to the first section of the Place the transition onto the duct. If the roof is sloped then duct without any additional frame for support. Therefore make make sure the transition is located correctly according to the sure the duct is fixed to the building using a strong method.
  • Page 11: Installing Electric Cables

    Note! The maximum length for the wall control cable to travel alongside the power cable is 10m / 33’. ILL1052-C IMPORTANT! Do not place the venturi assembly into the air cooler at this stage. ILL1288-C ILL1051-C SEELEY INTERNATIONAL - INSTALLATION MANUAL |...
  • Page 12: Water Connections

    WATER CONNECTIONS WATER CONNECTIONS cont. You have the choice of installing the Drain Valve and water If you have installed the drain valve, then fit the float valve and management system supplied, or not. If not, you need to install solenoid valve to the air cooler as shown.
  • Page 13 If salt starts to build up on the Cooling Pads insert another plug. Adjust the bleed rate until the salt build up is minimised. The water management devices fitted will help control the effects of poor quality water, but they cannot eliminate the problem. SEELEY INTERNATIONAL - INSTALLATION MANUAL |...
  • Page 14: Electrical Connection

    WATER CONNECTIONS cont. ELECTRICAL CONNECTION After fitting the Bleed Funnel, then fit the Float Valve as Now the Electronics Module must be re-fitted. First take the wall shown, complete with the Extension tube and 3/4” to 1/2” control cable and the Solenoid Valve cable (if installed) that are adaptor.
  • Page 15: Installing The Fan Assembly

    IMPORTANT! Ensure the cables cannot rest in the water once the tank is filled and plugs are connected in the correct orientation. ILL1678-A Now turn on the isolation switch and replace the pad frames (except the front padframe to allow access). ILL1229-D SEELEY INTERNATIONAL - INSTALLATION MANUAL |...
  • Page 16: Wall Control Location

    WALL CONTROL LOCATION INSTALLING THE WALL CONTROL PLASTER BOARD OR BRICK WALL Install the Wall Control station about 1.5 metres above the floor in the place where you want the temperature to be controlled To mount the wall control on a plaster board or brick wall, use from.
  • Page 17: Programming The Wall Control

    Feed the excess cable back into the hole and slide the wall control over the protruding bracket tabs. Pull the wall control down so the bracket tabs engage with the keyway slots on the back. ILL1133-A ILL1068-D SEELEY INTERNATIONAL - INSTALLATION MANUAL |...
  • Page 18 PROGRAMMING THE WALL CONTROL cont. PROGRAMMING THE WALL CONTROL cont. DRAIN RATE ADJUSTMENT If you installed the Drain Valve then the water will drain when the sensor detects that the water salinity is too high. Alternatively and if necessary, the air cooler can be set to replace some water after a set time of cooling operation with the following procedure.
  • Page 19: Commissioning The Cooler

    Stop the air cooler and check that each of the pads are evenly saturated. Finally, instruct the owner on how to operate the new air cooler. ILL1061-C WARNING! Do not run the pump while the pad frames are off and the fan is on. SEELEY INTERNATIONAL - INSTALLATION MANUAL |...
  • Page 20: Troubleshooting Guide

    TROUBLESHOOTING GUIDE Symptom Cause Action Pump not working correctly Check plug, wiring and circuit breaker. Check water level Inadequate cooling and sensor. Impellor may be jammed or obstructed. Rectify fault or replace pump. Dry pads. Check water flow to pads. Inspect fitment of distributor cap Check for blocked or kinked hose.
  • Page 21 2 x 5mm / 3/16” (Plasterboard) or 2 x 6mm / 1/4” (Brick) 65mm / 2.55” 31mm / 1.22” 16mm / 5/8” ILL1135-C SEELEY INTERNATIONAL - INSTALLATION MANUAL |...
  • Page 22: Installation Checklist

    The empty space (below) is your area to complete as you like. Simply forward it to any State Office of Seeley International Pty Ltd or...
  • Page 23 All regions: Please contact your local Breezair distributor seeleyinternational.com/service It is the policy of Seeley International to introduce continuous product improvement. Accordingly, specifications are subject to change without notice. Please consult with your dealer to confirm the specifications of the model selected.

Table of Contents