TABLE OF CONTENTS SAFETY Employer and Employee Responsibilities Installer and Maintenance Contractors – Risk Assessment QUICK GUIDE COOLER LOCATION EZQ DISASSEMBLY PREPARING THE DROPPER MOUNTING THE DROPPER Levelling the Dropper / Transition Securing the Dropper & Transition Sealing the Dropper CONVEYING THE COOLER TO THE ROOF MOUNTING THE COOLER WEATHERSEAL AND LATCH...
Is the top of the ladder clear of electricity supply equipment, training and qualifications of workers. cables? Seeley International provides the following information as a • Is there a roof anchor to attach a harness and lanyard to? If guide to contractors and employees to assist in minimising risk so, instruction should be issued for the use of an approved whilst working at height.
QUICK GUIDE STEP 1 STEP 2 STEP 3 SAFETY COOLER LOCATION PREPARE DROPPER Cut hole & fit grommet in Read & understand the safety section. Check cooler location. Consider regulations. Discuss with customer. dropper for cables. Page 1 Page 4 Page 5 STEP 7 STEP 8...
Page 5
Test the drain valve. Page 15 Page 14 Page 14 STEP 22 CUSTOMER HANDOVER Show customer how to operate the cooler. Give them both the MagIQtouch Controller and cooler owner’s manual. Explain maintenance requirements. Page 16 BREEZAIR EXQ/EZQ/EXS EVAPORATIVE COOLERS INSTALLATION MANUAL |...
• 1.5m (5’) from a gas flue, • 5m (17’) from a sewer vent, and • 600mm (2’) from a wall. EXQ/EXS MODELS ILL1653-A To separate the transition from the pallet cut off the front tabs and the rear flap.
ILL951-B Note! Some nails protruding from the timbers may be added to help locate them. For roof slopes greater than 45° add 15mm (0.6”) packer to top gauge. BREEZAIR EXQ/EZQ/EXS EVAPORATIVE COOLERS INSTALLATION MANUAL |...
MOUNTING THE DROPPER cont. LEVELLING THE DROPPER / TRANSITION EXTRA NOTES FOR EZQ MODEL ONLY Ensure the top of the dropper (or transition for EZQ model) is Fit & secure the transition to the top of the dropper, level and square in all directions (use a spirit level). This helps repeating the same fixing rationals for exposed, high with levelling the cooler.
ILL159-F For EXQ/EXS model, fix the cooler to the dropper with 8 self-tapping screws provided (2 screws per side). There are ten screw locations identified by “V” notches. If access to the “high roof side”...
A 10A socket outlet within one metre of the dropper’s cable exit operation. hole is required. Seeley International recommends: Important! Ensure that the cable in the dropper does not • Not routing data/communication and supply mains voltage interfere with the operation of the Weatherseal.
Installation of the cooler must conform to local electrical rules, spare RJ connector can be installed as follows; regulations and standards. Important! It is a requirement of Seeley International that all Breezair coolers be connected to a dedicated circuit to the distribution board, with a separate circuit breaker and incorporate all pole disconnection switch in accordance with the local wiring rules.
Any old hose sets should not be re-used. Fit the inlet solenoid under the tank as shown. For EXQ/EXS model coolers, fit the inlet solenoid under the tank as shown: ILL1102-E...
(before the power is turned on), where the water probes were connected. Correct Plug Orientation ILL2151-A ILL2151-A Failure to fit the shorting plug will result in the pump not operating. ILL2150-A BREEZAIR EXQ/EZQ/EXS EVAPORATIVE COOLERS INSTALLATION MANUAL |...
Coolers are supplied with a 20m (66’) control cable. Longer situated on the right hand side. The top LED glows green or red cable lengths are available from Seeley. acting as a diagnostic indicator. If the top LED is double flashing Important! The maximum cable length allowed from the green, everything is OK, this is normal operation.
Note! Once step 4 has been carried out, new parameter change is permanent until again altered. 6. If no buttons are pushed on wall control, after 3 minutes screen will reset to “OFF” state. Procedure to enter parameter mode must be re-initiated. BREEZAIR EXQ/EZQ/EXS EVAPORATIVE COOLERS INSTALLATION MANUAL |...
SETTING THE WATER LEVEL cont. Isolate power to the cooler electronics and disconnect the For EXQ, EXS model the correct water level is approximately 5mm above the surface of the tank the float valve is mounted on. pump, making sure the plug is kept away from any water. Turn the power back on.
5 minutes. When complete, drains the tank and returns to previous operation mode. routine where the pump will operate to saturate the pads. This cycle takes 2 minutes, then the fan will start automatically. BREEZAIR EXQ/EZQ/EXS EVAPORATIVE COOLERS INSTALLATION MANUAL |...
COMMISSIONING COMPLETION CHECKLIST COOLER DUCTWORK □ SECURE - The cooler is secure and level on the dropper □ NO LEAKS - All ducts are hung correctly and there are no air using all fixings supplied. leaks. □ SEALED - The dropper and all penetrations are correctly □...
Heavy pad deposits. Clean or replace pads. Air Sensor not working Air Sensor not plugged into the control box Plug Air Sensor cable into the electronics control box. Air Sensor failure Replace Air Sensor BREEZAIR EXQ/EZQ/EXS EVAPORATIVE COOLERS INSTALLATION MANUAL |...
Page 20
6 WITTON ROAD, FOUNDERSVIEW SOUTH, MODDERFONTEIN 1609, GAUTENG, SOUTH AFRICA It is the policy of Seeley International to introduce continuous product improvement. Accordingly, specifications are subject to change without notice. Please consult with your dealer to confirm the specifications of the model selected.
Need help?
Do you have a question about the EXQ and is the answer not in the manual?
Questions and answers