Seeley LCB250 Owner's Manual

Seeley LCB250 Owner's Manual

Evaporative cooler
Hide thumbs Also See for LCB250:

Advertisement

OWNER'S MANUAL
Evaporative Cooler
ILL1456-A
(English) (LCB, CPL, BM)
®

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LCB250 and is the answer not in the manual?

Questions and answers

Summary of Contents for Seeley LCB250

  • Page 1 OWNER’S MANUAL Evaporative Cooler ILL1456-A (English) (LCB, CPL, BM) ®...
  • Page 2 Introduction Wall Control Functions Drain Valve & Bleed System Maintenance Service Checklist Troubleshooting ® ® CPL LCB BM Evaporative Cooler...
  • Page 3 INTRODUCTION Effective cooling Congratulations on choosing a new Seeley International cooler for your home. To provide efficient cooling or ventilation the Your cooler is built from the highest quality building must have sufficient exhaust openings materials and engineered to provide many years to outdoors in the form of doors, windows or of economical, trouble free cooling.
  • Page 4: Wall Control Functions

    WALL CONTROL FUNCTIONS Starting your cooler The ON/OFF button turns the air cooler on and off. There are two modes of operation to choose from, Automatic mode or Manual mode. When the air cooler is turned on, it will start in the mode of operation it was in when last turned off.
  • Page 5: Automatic Mode

    Press S to increase the fan speed and circulate more air. Press T to decrease the fan speed and circulate less air. Press once to change the speed by one increment. Hold the button down to change the speed more quickly. SEELEY INTERNATIONAL – OWNER’S MANUAL...
  • Page 6 WALL CONTROL FUNCTIONS - cont. Timed automatic start You can set the air cooler so that it will turn on after a set number of hours. 1. To set the delayed start time, press TIMER with the cooler turned OFF. “Starting in” will be displayed as shown with the last mode of operation (Manual or Automatic).
  • Page 7 S wall control. This is the best way to get the and T for 1 second. The display will show “dr” most from your air cooler. to confirm the operation has activated. ILL1478-A SEELEY INTERNATIONAL – OWNER’S MANUAL...
  • Page 8: Maintenance

    MAINTENANCE Health regulations Seasonal maintenance is only required if you have a cooler fitted with a bleed system. The Note that some regulating authorities require following pages outline the maintenance services to be conducted at specific intervals. required at the end of the season and then at the start of the next season.
  • Page 9: Pre-Season Service

    Check the pads are wetting evenly. Check there are no water leaks either internally or external to the cooler. Check Drain Valve/Bleed Funnel operation. Check Wall Control operation. 1 Manual and Auto modes 2 Speed Control 3 Display Panel. SEELEY INTERNATIONAL – OWNER’S MANUAL...
  • Page 10 ROUTINE MAINTENANCE SERVICE SCHEDULE CHECKLIST Service Item Check/adjust Clean Replace 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 Water Distribution System Chillcel pads (replace as required) Pad retaining washers / pins Base / water reservoir Pump filter basket Water probes Water distribution system...
  • Page 11: Troubleshooting Guide

    Dealer or the Service number on the back of this manual. “SERVICE” immediately on power up indicates SERVICE communications needs to be established Push & hold the “DOWN” button for at least 10 seconds until the word “SERVICE” disappears SEELEY INTERNATIONAL – OWNER’S MANUAL...
  • Page 12 Affix serial & model number stic ker here It is the policy of Seeley International to introduce continual product improvement. Accordingly, specifications are subject to change without notice. Please consult with your dealer to confirm the specifications of the model selected.

Table of Contents