This is indicated by the bar graph in the centre of the display. To decrease or increase the fan speed required, press either the buttons. SEELEY INTERNATIONAL – INSTALLATION & OPERATION MANUAL...
Page 6
Using the SENSORTOUCH Remote Control AUTO TIMER MODE (4) Setting the OFF time minutes Programming the timer must be performed before AUTO Press the button. The minutes displayed will start TIMER can be activated. This can be done while in any flashing and the word OFF will appear.
Page 7
After a 30 second delay, the pump will turn on and saturate the cooling pads. (3)..After the pump has been running for 2 minutes the ILL1111-A fan will start. SEELEY INTERNATIONAL – INSTALLATION & OPERATION MANUAL...
Page 8
Using the SENSORTOUCH Remote Control The high salinity setting is designed to operate the cooler at a maximum safe salinity level to maintain a AUTO COOL normal working life. It also results in a minimum usage of water. SPEED MANUAL COOL BATTERY LOW ILL1106-A...
The timed start will not repeat. MANUAL MODE ILL1124-A To switch to Manual mode, press until “Man” appears in the display. In Manual mode the cooling level can be manually adjusted. ILL1117-A SEELEY INTERNATIONAL – INSTALLATION & OPERATION MANUAL...
Page 10
Using the SENSORTOUCH Wall Control TIMED AUTOMATIC STOP DRAIN VALVE You can also set the air cooler so that it will turn off after a This air cooler is supplied with an automatic drain that set number of hours. performs two primary functions: 1.
Take hold of the pad frame and pull it towards you until the internal side clips disengage. Pivot the pad frame outwards and lift up. Take care not to damage the pad. Repeat these steps for the remaining pad frames. (Fig. ILL187-E SEELEY INTERNATIONAL – INSTALLATION & OPERATION MANUAL...
Pre-Assembly Inspection PRE-ASSEMBLY INSPECTION Check that the correct cooler has been supplied. The cooler should have the following parts:- (Check the parts are inside the cooler by removing a cooling pad frame.) EXV Evaporative Cooler...
Polymer coolers are light-weight but jack check that water spreaders and they require adequate support. The other internal components are all largest cooler in the EXV range is about securely in place. 185 lbs (84 Kgs). SEELEY INTERNATIONAL – INSTALLATION & OPERATION MANUAL...
Installation Details Attach the cooler to the roof jack from INSTALLING THE INLET SOLENOID inside the cooler (Fig. 7), using 1¼" long VALVE self-tapping screws. Use a minimum of Fit the inlet solenoid valve under the six (6) screws. In high wind areas or pan as shown (Fig 14).
Wall Mounted Thermostat Control flow when it runs back into the pan. making connections and clamping the (wall control) Water level should be about ¼" above conduit cable. the float valve support shelf. (Fig. 18) SEELEY INTERNATIONAL – INSTALLATION & OPERATION MANUAL...
Page 16
Installation Details Check the measured amps against the The outer half of the pulley is on a INLET DRAIN Entrada Valvula motor nameplate amps If the measured thread and can be moved in or out by de drenaje RECEIVER del agua Receptor amps are less than the nameplate amps the removing the locking cap and then...
A = Metal Roofing. bracket, tighten B = Wood or Metal Beam. screws to hold C = Receiver (Mount as close as the bracket in it’s possible to the metal roof). correct position. SEELEY INTERNATIONAL – INSTALLATION & OPERATION MANUAL...
Testing the Cooler LOCATION AND TESTING 1 Red Flash indicates After you have set the motor amps Important One of the most critical parts ..Fault Code #1 – Communication Failure. and belt tension correctly, check the of the installation is the location of the 2 Red Flashes indicates speed variation of the cooler.
Page 19
Initiate a drain of the pan by pressing drain button on the remote control or & button together on Wall Control. Check the drain fittings and pipes, making sure there are no leaks. SEELEY INTERNATIONAL – INSTALLATION & OPERATION MANUAL...
Installation Checklist Owners Name:______________________ Cooler level and secure. __________________________________ All roof work properly sealed. Telephone:_________________________ Address:___________________________ Ductwork and air distribution checked and outlets correctly set. __________________________________ All wiring complete. __________________________________ Dealer:____________________________ Control switch correctly installed. __________________________________ Motor and pump correctly plugged into sockets. Installer:___________________________ __________________________________ Drain/overflow fitting correctly installed.
Consult with power supply authority. Low system voltage. Check fault condition via the tri-colour LED Rectify fault as indicated and restart the cooler. (Refer Pg. 15-16) on electronic module. Replace controller. Controller failed. SEELEY INTERNATIONAL – INSTALLATION & OPERATION MANUAL...
Page 22
Installation Troubleshooting PROBLEM PROBABLE CAUSE SUGGESTED REMEDY Insufficient water in pan. Adjust float level. Pump runs but no water circulation. Pump runs but pads lack water. Water hoses blocked. Check and clean out blockage. Pump strainer blocked. Clean pump strainer. Continuous overflow of water.
Appendix A - Wiring Diagram 65’ SENSORTOUCH Wall Control 16’ ILL665-D REMOTE CONTROL AUTO COOL SPEED ECONOMY SENSORTOUCH Remote Control SEELEY INTERNATIONAL – INSTALLATION & OPERATION MANUAL...
Page 24
Seeley International (Americas) Phone: 602-353-8066 Fax: 602-353-8070 Toll Free: 1-800-926-6824 www.convaircooler.com It is the policy of Seeley International to introduce continual product improvement. Accordingly, specifications are subject to change without notice. seeleyinternational.com 847078-D US 1203...
Need help?
Do you have a question about the Breezair EXV and is the answer not in the manual?
Questions and answers
Should the two dots separating the hour and minutes remain flashing after setting time
Should the two dots separating the hour and minutes be flasing