Steps – initial start-up, inspection and . . .
Commissioning steps
Inspection steps
Maintenance steps
!
!
!
•
•
•
21. Checking the tightness of electrical connections
•
•
•
22. Checking all gas equipment for soundness at
operating pressure
•
•
•
23. Flue gas emissions test
•
•
•
24. Checking the ionisation current
•
•
•
25. Checking the external LPG safety valve (if
required)
•
26. Matching the control unit to the heating system
•
27. Adjusting the heating curves (only for weather‐
compensated control units)
•
28. Connecting the control unit to the LON system
(only for weather‐compensated control units)
•
29. Implementing a user check (in conjunction with
the LON system with a weather‐compensated
control unit)
•
30. Instructing the system user
•
31. Scanning and resetting the "maintenance" display 49
Initial start-up, inspection, maintenance
(cont.)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Page
36
37
38
39
. . . . . . .
43
46
. . . . . . . . . .
48
48
19