Huawei SmartAX MA5612 Maintenance Manual page 279

Multi-service access module
Table of Contents

Advertisement

SmartAX MA5612 Multi-service Access Module
Maintenance Guide
Figure A-3 Peeling the insulation layer off the power cable
When peeling off the insulation layer of the power cable, ensure that the conductor of the power
cable is not scratched.
Table A-2 Mapping between the cross-sectional area and the length of insulation layer to be
peeled off (L1)
Cross-sectional Area (mm
1
1.5
2.5
4
6
10
16
25
35
50
Step 2 Insert the conductor of the peeled power cable into the cord end terminal, as shown in
A-4.
Issue 01 (2012-07-25)
Power cable
Conductor
CAUTION
2
)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
L1 (mm)
8
10
10
12
14
15
15
18
19
26
A Appendix
Figure
270

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents