Electrical Connections - Champion E Series Installation/Operation Manual With Service Replacement Parts

Blower dryer option, electric or steam, for all rack conveyor and upright conveyor dishwashers
Table of Contents

Advertisement

Installation
Electric Heat Blower Dryer Electrical Connections
Main electrical power to the blower dryer is connected at the main terminal block
located at the bottom of the blower dryer control cabinet located on the side of
main blower. Interconnect cables from the dishwasher to the blower dryer
were disconnected prior to shipment and rolled back behind the dishwasher
control cabinet. Reconnect these cables after mounting the blower dryer.
To connect main power:
1.
Remove the control cabinet cover
and locate the main terminal block
(MTB) in the corner of the cabinet.
2.
Refer to the Machine Electrical
Connection Data Plate located
near the main terminal block and
make sure that the incoming
power supply matches the
machine's electrical requirements.
3.
Connect the incoming 3-phase
power as shown in the illustration
below.
THREE PHASE
POWER CONNECTION
208/240/480/575V/60/3
L1
L2
L3
LINE IN
Electric Heat Main terminal block (MTB).
4
WARNING:
Electrocution or serious injury may result when working on an
energized circuit.
Disconnect power at the main breaker or service disconnect
switch before working on the circuit.
Lock-out and tag the breaker to indicate that work is being
performed on the circuit.
GRD
(MTB)
Machine Electrical Connection
AUTO
OFF
(Left to Right Cabinet Shown)
Electric Heat Blower dryer control cabinet.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ebd

Table of Contents