BÖWE P26 Instruction Manual page 81

Hide thumbs Also See for P26:
Table of Contents

Advertisement

11. Maintenance
- If necessary, add neutralization agent to the still:
Put neutralization agent into the button trap.
Pump solvent from tank 2 into the cage:
5
+
+
PROG
Pump solvent with neutralization agent for distillation:
6
PROG
+
+
- When necessary, you must also perform maintenance work on machines with an emission-free
still rake out system with the still door open (lint balls, caked-on dirt).
Sequence of the maintenance work:
Start program P45:
4
+
+
PROG
The horn sounds at the end of the program and symbol 15 disappears.
Distillation maintenance runs without rinsing.
Let the still cool overnight
Now perform the maintenance work that is described under "Sequence for additional maintenance
work."
74
7
+
~ 10 liter
START
~ 2.6 US gal
2
START
+
Pump suctions
until it is dry
5
+
Display shows 8
START
+
+
STOP
PROG
HOLD
STOP
+
PROG
0
E
+
11.
C
+
C
+
+
HOLD
P21/P26/P30

Advertisement

Table of Contents
loading

This manual is also suitable for:

P21P30

Table of Contents