Activating Screed Drying; Adjusting The Pump Rate Of The Integral Circulation Pump - Viessmann VITODENS 222-F Installation And Service Instructions Manual

Gas condensing storage combi boiler
Table of Contents

Advertisement

Commissioning, inspection, maintenance

Activating screed drying

Screed drying
6 different temperature profiles can be set for screed
drying:
Preset temperature profiles can be set via parameter
897.0 "Screed drying" in the General group.

Adjusting the pump rate of the integral circulation pump

The pump speed and consequently the pump rate are
regulated subject to the outside temperature and the
switching times for heating mode or reduced mode.
The minimum and maximum speeds for heating mode
can be matched to the existing heating system at the
control unit.
Setting (%) in the "Heating circuit 1" group:
Min. speed: Parameter 1102.0
Max. speed: Parameter 1102.1
Residual head of integral circulation pump
19 to 25 kW
550 55
L
500 50
450 45
K
400
40
H
350 35
300
30
G
250 25
F
200
20
150 15
E
100
10
D
50
5
C
A
B
0
0
0
100
200
Flow rate in l/h
Fig. 30
Operating range upper limit
M
38
300
400
500
600
700
For further details, see "Function description".
In the delivered condition, the minimum pump rate
and the maximum pump rate are set to the following
values:
Rated heating output
in kW
19
25
32
In conjunction with a low loss header, heating water
buffer cylinder and heating circuits with mixer, the
internal circulation pump runs at a constant speed.
Speed setting (%): Parameter 1100.2 in the Boiler
group
M
800
900
1000
1100
1200
Speed settings in the
delivered condition in %
Min. pump
Max. pump
rate
rate
50
75
50
95
40
100

Advertisement

Table of Contents
loading

This manual is also suitable for:

B2te

Table of Contents