Routing Connecting Cables/Leads - Viessmann VITODENS 222-F Installation And Service Instructions Manual

Gas condensing storage combi boiler
Table of Contents

Advertisement

Electrical connections
Angle of penetration
The reception quality remains best if radio signals hit
the walls vertically.
Depending on the angle of penetration, the effective
wall thickness changes and so does the extent to
which the electromagnetic waves are damped.
Flat (unfavourable) angle of penetration
C
B
Fig. 20
A
WiFi router
Heat generator
B
Wall
C

Routing connecting cables/leads

!
Please note
If connecting cables/leads come into contact
with hot components, they will be damaged.
When routing and securing cables/leads on site,
ensure that the maximum permissible tempera-
tures for these cables/leads are not exceeded.
(cont.)
A
Ideal angle of penetration
A
C
B
Fig. 21
WiFi router
A
Heat generator
B
Wall
C
Installation sequence
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

B2te

Table of Contents