To Install The Positive Suction Head - Pentair Pool Products Nocchi CPS 10 Use And Maintenance Manual

Table of Contents

Advertisement

8.3

TO INSTALL THE POSITIVE SUCTION HEAD

1
Basin or tank
2
Float
3
Shut-off valve
4
Outlet tubing
5
Tank/autoclave membrane (8 l/min)
6
Gauge
For the installation of the positive suction head, ensure the correct inclination of the suction piping until the
air present in the tubing can exit the outlet tubing.
52
7
Pressure transducer
8
Flexible tube
9
Non return valve
10
Filter
11
Motor pump complete with inverter
Page 25 of 30
25 - GB -

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nocchi cps 20

Table of Contents