Power-Up And Test; Figure C-10. Securing The Cover - Bay Networks Remote Annex 4000 Hardware Installation Manual

Hide thumbs Also See for Remote Annex 4000:
Table of Contents

Advertisement

Appendix C
Port Upgrade Instructions

Power-up and Test

C-8
Remote Annex 4000 Hardware Installation Guide
2
Secure the cover and cable retainers using ten screws
(see
Figure
C-10).
Do not over-tighten these screws (beyond 10 in-
lbs. of torque).

Figure C-10. Securing the Cover

The following instructions describe the power-up and test sequence.
1
Reconnect all the cables, including:
The transceiver cable.
Existing cables for the serial devices.
The parallel printer cable.
The console terminal cable.
The power cord.

Advertisement

Table of Contents
loading

Table of Contents