Siemens SITOP UPS1600 Getting Started page 30

Hide thumbs Also See for SITOP UPS1600:
Table of Contents

Advertisement

Parameterizing the SITOP UPS1600
6.2 Switching off the UPS by a user program when the power fails
Preconditions
The following preconditions must be fulfilled in order to be able to use function block FB160:
● The library with the function block has been downloaded to the PC.
● The generic station description (GSD) for the UPS1600 has been installed in STEP 7 V5.
● The UPS1600 has been set up for buffer operation (see Chapter Buffering an S7 IO
Loading the block library into STEP 7 V5
1. Open the project into which the FB160 function block should be inserted.
2. Select the menu command "File > Open...".
30
controller, including the I/O when the power fails (Page 21)).
Dialog box "Open Project" is opened.
SITOP UPS1600 under STEP 7 V5
Getting Started,

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents