Manaras Opera Opera-GH Installation And Instruction Manual page 7

Table of Contents

Advertisement

4.2 INSTALLATION OF Opera-GH OPERATOR
IMPORTANT NOTE: THIS OPERATOR MUST BE INSTALLED A MINIMUM OF 8 FT. (2.4 m) ABOVE FLOOR.
To open the control box cover, loosen the screw at the base of the cover. If the cover cannot be fully opened,
the retaining arm may be used to hold the cover in other positions.
Retaining arm
After installation, verify that there is no obstacle in the way when opening the control box cover. If so, it is
possible to remove the cover by unscrewing it from the box before putting the operator on the wall or hood
(see Figure 5).
Remove the
screw
7
Figure 4
Control box cover opening
Figure 5
Unscrewing control box
Remove the
screw

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Opera-GH and is the answer not in the manual?

Related Products for Manaras Opera Opera-GH

Table of Contents