Siemens SIMOTICS FD 1LN1 Operating Instructions & Installation Instructions page 7

Low-voltage motor
Table of Contents

Advertisement

5.4.4
5.4.5
Axial and radial forces............................................................................................................71
5.5
Connecting the cooling water supply .....................................................................................72
6
Electrical connection...................................................................................................................................75
6.1
Safety instructions for the electrical connection .....................................................................75
6.2
Basic rules..............................................................................................................................75
6.3
Terminal box ..........................................................................................................................76
6.3.1
Terminal box 1XB1621...........................................................................................................77
6.3.2
Terminal box 1XB1631...........................................................................................................77
6.3.3
Terminal box 1XB7730...........................................................................................................78
6.3.4
Terminal box 1XB7731...........................................................................................................79
6.3.5
Terminal box 1XB7740...........................................................................................................79
6.3.6
Terminal box 1XB7750...........................................................................................................80
6.3.7
Rotating the terminal box .......................................................................................................80
6.3.8
Mounting/removing the terminal box ......................................................................................83
6.4
Preparation.............................................................................................................................84
6.4.1
Terminal designation..............................................................................................................84
6.4.2
Selecting cables .....................................................................................................................84
6.4.3
Connecting the grounding conductor .....................................................................................85
6.4.4
Connection without terminal box ............................................................................................86
6.4.5
Connecting the machine for a specific direction of rotation....................................................87
6.4.6
Undrilled entry plate ...............................................................................................................87
6.5
Inserting and routing the cables .............................................................................................88
6.5.1
Bringing cables into the terminal box 1XB... with sealing insert with break-off ring ...............88
6.5.2
Bringing cables into the terminal box 1XB... with cable gland................................................89
6.5.3
Laying cables .........................................................................................................................90
6.5.4
Connecting cables with cable lugs .........................................................................................90
6.5.5
Connecting cables without cable lugs ....................................................................................91
6.5.6
Use of aluminum conductors..................................................................................................93
6.5.7
Using single-stranded cables .................................................................................................93
6.5.8
Internal equipotential bonding ................................................................................................93
6.5.9
Stepless mating face for the seal in the terminal box cover ..................................................94
6.5.10
Minimum air clearances .........................................................................................................94
6.5.11
Finishing connection work......................................................................................................95
6.6
Connecting the auxiliary circuits.............................................................................................95
6.6.1
Selecting cables .....................................................................................................................95
6.6.2
Bringing cables into the auxiliary terminal box and routing them ...........................................96
6.6.3
Connecting an external fan motor ..........................................................................................96
6.6.4
Connecting temperature monitoring for the stator winding ....................................................97
6.6.5
Terminating the connection work (auxiliary circuit) ................................................................98
7
Start-up.......................................................................................................................................................99
7.1
Checks to be carried out prior to commissioning ..................................................................99
7.2
Converter operation .............................................................................................................101
7.3
Measuring the insulation resistance before commissioning.................................................101
7.4
Greasing the roller bearings prior to commissioning............................................................102
SIMOTICS FD 1LN1
Operating Instructions 01/2019
Table of contents
7

Advertisement

Table of Contents
loading

Table of Contents