Installation - Maguire Products VBD-150 Installation Operation & Maintenance

Vacuum dryer
Hide thumbs Also See for VBD-150:
Table of Contents

Advertisement

VBD® - Vacuum Dryer®

Installation

Transport and Setup
Shipment
The VBD-150 Dryer is shipped on two skids with 4 main sections.
(A) Heating Hopper Assembly
(B) Vacuum Chamber Assembly
(C) Retention Hopper Assembly
(D) Control Panel
Lifting and Moving components of the Dryer
Ensure your lifting equipment is rated to lifting the weight
of the individual sections of the VBD-150.
8
Rev. August 31, 2016 – VBD-150
Maguire Products, Inc.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents