Maguire Products VBD-150 Installation Operation & Maintenance page 59

Vacuum dryer
Hide thumbs Also See for VBD-150:
Table of Contents

Advertisement

VBD® - Vacuum Dryer®
Installing the Vacuum Chamber
Rest the Vacuum Chamber back onto the fully
extended Sliders. The Vacuum Chamber has
three resting pins. Orient the side with two resting
pins on the left Slider rail.
Push the Slider rails and Vacuum
Chamber back into the Dryer until
the Slider Lock falls into place.
Install the air lines. Rotate the locking ring fully
clockwise to secure the air connection.
Slide the Retention Hopper sealing collar up so
that the magnets engage onto the bottom of the
Vacuum Chamber.
Raise the Vacuum Chamber by switching
up the Vacuum Chamber Lift Switch.
Pinch Hazard - Keep fingers clear of
Vacuum Chamber Main Seal when the
Vacuum Chamber Lift Switch is flipped up.
Turn on air pressure. Rotate counterclockwise.
Turn on Main Power.
Rev. August 31, 2016 – VBD-150
Maguire Products, Inc.
59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents