Installation sequence
Mounting the boiler and making connections
1. Position the supplied installation
template on the wall.
2. Mark out the rawl plug holes.
3. Drill 7 10 mm holes and insert the
rawl plugs supplied.
16
(cont.)
4. Fit the wall mounting bracket with
the screws supplied.