Nortek Security & Control Mighty Mule MM372W Installation Manual page 22

For a single or dual gate installation
Table of Contents

Advertisement

Your Property
Step 10
● Secure the gate bracket with the
supplied hardware as shown.
Step 11
● Once the gate post and gate
brackets are installed, reattached
the operator arm.
V
● Ensure the operator arm is level,
T
adjusting the post bracket location
L
if necessary.
● Once level, ensure all hardware is
tight.
● Remove excess bolt length with a
hacksaw.
Installing the Secondary Operator (MM372W only):
Install the secondary operator on the remaining leaf by repeating the same process illustrated in steps 1-11 above.
Note: You will need to run the secondary operator power cable and any hard wired accessory wires under the driveway to the
control box (use of conduit is recommended). Locating the primary operator on the gate leaf closest to the power source or desired
solar panel location is recommended. See front page of this manual for a complete installation example.
After you have mounted the second operator, proceed to Installation of the Closed Position Stop Plate on the following pages.
6
MM371W / MM372W Installation Instructions
PULL-TO-OPEN OPERATOR MOUNTING
P
L
L
V
T
N

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Mighty Mule MM372W and is the answer not in the manual?

This manual is also suitable for:

Mighty mule mm371w

Table of Contents

Save PDF