Time to service
Makes it possible to check the first maintenance operation to be carried out on the compressor; the
maintenance operations to be carried out 100 hours after this are also displayed. In this way, the user
can schedule maintenance operations and, if necessary, decide whether to replace several components
during the same maintenance operation
Components life
indicates the remaining service life of each component that requires periodic maintenance
Compon. replacement
If the function is enabled, it makes it possible to reset the component life counters after maintenance
Running hours
Indicates
compressor operating time (total running hours, running hours at full load)
G
A table with the schedule of the maintenance operations to be carried out is provided below
B
Replace separator
Maintenance periods may differ from those indicated.
During installation, Service Centre personnel assess compressor operating conditions and if necessary modify
the frequency of the operations.

GENERAL SETTINGS menu

This menu allows to carry out the general settings of compressor operating configuration with the exception
of operating parameters (pressures, timings).
Language
Used to select the language of the messages
Measur. unit
Used to set the measurement units for pressure and temperature
(continued on p
. 49)
First 100 hours
Intervention
maintenance
coupon
Check air filter
Replace air filter
Change oil
Replace oil filter
filter
Replace air dryer
filters
P. 46 - Chap. 7 Start-up and operation
First 1000 hours
maintenance
Every 1000 hours Every 2000 hours
coupon
7.4.2.3