Framing Dimensions - Passive Heat Open Top Discharge (PH-FRT-LINEAR)
Open Top Discharge: Both sides and the top are open allowing air to be conveyed into the room.
WARNING! Risk of Fire! Mesh screen required on bottom of discharge opening when discharge
opening is greater than 3 inches. Secure mesh to top of framing.
JADE32IN-B
JADE42IN-B
JADE42IL-B
*
Mesh screen required for front discharge or open top discharge passive heat installations with discharge
opening of 3 inches or greater.
Mesh screen recommended for front discharge or open top discharge passive heat installations with discharge opening
of less than three inches.
Figure 3.9 Passive Heat Minimum Framing Dimensions Open Top Discharge
Majestic • JADE32IN-B, JADE42IN-B, JADE42IL-B Installation Manual • 2619-986 Rev. B • 10/19
C
OPEN TOP DISCHARGE MINIMUM FRAMING DIMENSIONS
Height of Discharge
Opening
Inches
millimeters
Inches
millimeters
A*
B
Clearance to
Discharge Opening
2
48
51
1219
2
48
51
1219
A
B
C
Width of Discharge
Opening
31-1/8
791
48-1/2
1232
17