2 Components
a
Service cover screw
b
Service cover
To remove the front grille
CAUTION
Wear protective gloves.
1 Open the front panel. Refer to
page 42.
2 Remove the service cover. Refer to
cover" on
page 43.
3 Remove the wire harness from the wire clamp and the
connector.
4 Remove the flap by pushing it to the left side and towards you.
5 Remove the 2 screw covers using a long flat plate such as a
ruler wrapped in a cloth and remove 2 screws.
a
Connector
b
Wire clamp
c
Screw cover
d
Long flat plate wrapped in a cloth
6 Push the front grille up and then towards the mounting plate to
remove the front grille from the 3 hooks.
a
a
Hook
Prerequisite: If working space is limited.
7 Insert a flat screwdriver next to the hooks.
8 Pull the front grille up using the flat screwdriver and push
towards the mounting plate.
a
Hook
b
Flat screwdriver
To re-install the front grille
1 Install the front grille and firmly engage the 3 upper hooks.
Service manual
44
"To open the front panel"  on
To remove the electrical wiring box cover
"To open the service
a
b
a
c
d
2.14
2.14.1
To perform an electrical check of the reactor
Prerequisite: Turn OFF the unit via the user interface.
Prerequisite: Turn OFF the respective circuit breaker.
Prerequisite: Remove the required plate work, see
work" on
a
b
2 Tighten the 2 screws and put the 2 screw covers back.
3 Re-install the flap.
4 Insert the wire harness back into the connector and secure it
with the wire clamp.
5 Close the front panel. Refer to
"To close the front panel"  on
page 43.
1 Remove the front grille.
2 Remove 1 screw from the electrical wiring box.
3 Open the electrical wiring box cover by pulling it to the front.
4 Remove the electrical wiring box cover from the 2 rear hooks.
b
a
Screw
b
Electrical wiring box
c
Rear hook
5 To re-install the cover, first attach the electrical wiring box to the
hooks, close the electrical wiring box, and re-install the screw.

Reactor

Checking procedures

page 40.
1 Open the compressor insulation.
2 Remove the cover of the compressor wire terminals.
a
a
Compressor wire terminals cover
INFORMATION
The reactor will trip at a temperature of 115°C and will
reset at a temperature of 95°C.
(C)(F)TXA15~50A2V1B(W)(S)(T) + RXA42+50A2V1B +
c
c
"2.13  Plate
RXA20~35A2V1B
Split Stylish R32
ESIE18-03 – 2018.09

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents