ProMinent DULCOTEST DT1B Operating Manual page 35

Table of Contents

Advertisement

d) Chlorine together with ozone
1.
In a 24 mm cuvette add a 10 ml
water sample and carry out a
zero correction, see
Ä „Switching on and zero cor‐
rection" on page 13
2.
Remove the cuvette from the
sample chamber and empty the
cuvette down to the last few
drops
[DPD No. 1] tablet and
3.
Insert a
[DPD No. 3] tablet directly
a
from the foil into the water
sample and crush the tablets
using a stirring rod
4.
Fill the cuvette up to the 10 ml
marking with the water sample
5.
Close the cuvette using the cuv‐
ette lid
6.
Mix the contents of the cuvette
by tipping it back and forth, until
the tablets have dissolved
7.
Position the cuvette in the
sample chamber
ð Observe the correct posi‐
tioning of the cuvette.
8.
Switch the countdown on, see
Ä „ Switching the countdown
function on" on page 14 . To do
this, press the
[ZERO/TEST] key
ð Wait for the 2 minutes reac‐
tion time to elapse
9.
The METHOD symbol flashes
for approximately 3 seconds
[!] and
ð The result of Total chlorine
+ ozone = display value
appears in mg/l in the dis‐
play.
10.
Remove the first cuvette from
the sample chamber
11.
Thoroughly clean the cuvette
and the cuvette lid
12.
Fill a second cuvette with a 10
ml water sample
[GLYCINE] tablet
13.
Insert a
directly from the foil into the
water sample and crush the
[GLYCINE] tablet with a stirring
rod
14.
Close the cuvette with the cuv‐
ette lid and mix the contents by
tipping back and forth until the
tablet has dissolved
[DPD No. 1] tablet and
15.
Insert a
[DPD No. 3] tablet directly
a
from the foil into the water
sample and crush the tablets
using a stirring rod
16.
Pour the contents of the second
[GLYCINE] solution)
cuvette (
into the prepared cuvette
17.
Close the cuvette with the cuv‐
ette lid and mix the contents by
tipping back and forth
18.
Place the cuvette in the sample
chamber
ð Observe the correct posi‐
tioning of the cuvette.
Analysis methods
[A]
35

Advertisement

Table of Contents
loading

Table of Contents