ROOF PANEL INSTALLATION [PANEL REPLACEMENT]
Symbol Mark
SYMBOL MARK
Installation Procedure
1. When installing new parts, measure and adjust the body as necessary to conform with standard dimensions.
2. Drill holes for the plug welding before installing the new parts.
3. After temporarily installing new parts, make sure the related parts fit properly.
BODY STRUCTURE [PANEL REPLACEMENT]
MEANING
PLUG WELDING (CO 2 ARC WELDING)
id098008744400
am6zzb0000011
09-80B–93