TORQUE BOX INSTALLATION [PANEL REPLACEMENT]
Symbol Mark
SYMBOL MARK
Installation Procedure
1. When installing new parts, measure and adjust the body as necessary to conform with standard dimensions.
2. Drill holes for plug welds before installing new parts.
3. After temporarily installing new parts, make sure the related parts fit properly.
4. Plug weld the 32 locations indicated shown in the figure.
End Of Sie
BM: FRONT PILLAR
09-80B–46
BODY STRUCTURE [PANEL REPLACEMENT]
3
2
3
2
MEANING
PLUG WELDING (CO 2 ARC WELDING)
6
4
id098008607200
am6zzb0000002
TORQUE BOX
8
am6zzb0000015