CENTER PILLAR INSTALLATION [PANEL REPLACEMENT]
Symbol Mark
SYMBOL MARK
Installation Procedure
1. When installing new parts, measure and adjust the body as necessary to conform with standard dimensions.
2. Drill holes for the plug welding before installing the new parts.
3. Apply the weld bond shown in the figure.
WELD BOND APPLICATION AREA
09-80B–58
BODY STRUCTURE [PANEL REPLACEMENT]
MEANING
PLUG WELDING (CO 2 ARC WELDING)
CONTINUOUS CO 2 ARC WELDING (CUT-AND-JOIN LOCATION)
id098008744000
am6zzb0000024
am6xub0000007