Fleck 5600 Service Manual page 19

Hide thumbs Also See for 5600:
Table of Contents

Advertisement

MODEL 5600 & 5600 ECONOMINDER
Water Conditioner Flow Diagrams (Cont'd.)
7
SETTLING RINSE POSITION
5 Minutes
Hard water enters the unit at the valve inlet - flows
around the lower piston groove - down thru the top
of tank passage - downward thru the resin - up the
distributor tube - thru the center hole in the piston -
over the top edge of the piston and out the drain
line.
8
BRINE TANK FILL POSITION
4 to 24 Minutes Adjustable Cycle
Hard water enters the unit at the valve inlet - flows around
the lower piston groove - thru the injector throat - thru the
brine valve and flow control to fill the brine tank. Hard
water also flows around the lower piston groove - thru the
passage to the top of tank - down thru the resin and
enters the distributor as conditioned water. The
conditioned water flows up thru the center tube to the
valve outlet.
Printed in U.S.A.
®
Page 19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents