WARNING
CAUTION
Keysight N4391B Optical Modulation Analyzer Getting Started Guide
Finalizing the System
Use two persons to lift the system!
The semi-rigid cables are extremely sensitive! Handle them very
carefully!
1
Use two persons to turn the system back to upright position.
Do not yet have the semi rigid connector cables installed.
2
Starting from the left, very carefully attach the semi-rigid cables as
shown in
0.4 Nm (4-in-lb).
3
To protect the semi-rigid cables from unintended impact, mount the
protective cover as shown in
Figure 5
on page -26. Tighten with torque wrench, torque
Figure 5
Getting Started
on page -26.
2
25