Harmar Mobility HIGHLANDER EPL400 Installation And Owner's Manual page 9

Enclosure with commercial platform lift
Table of Contents

Advertisement

9
Installing Enclosure tower walls:
Step 1
Place and shim (if necessary) the lowest front
wall, the door frame and the tower-side walls on
the door-side of the enclosure. Again, the
lowest tower side-panel has the vent holes and
goes in 'backward.' This side has the big hole
for the pit-emergency stop switch. Assemble
and install the pit switch and its box. Note, the
doorframe may be received with the door
already installed.
Step 2
Install the rest of the front and tower-side
panels. Now you're able to put on the Lift Top
Cap. For lifts taller than eight-foot lift, you may
skip ahead to the anchor-step, page 10.
Step 3
Your door will come assembled to the frame and
may already be on the unistrut (step 1) If not, put
eight twist-type strut-nuts into the channels. The
door assembly weighs more than 200 lbs, so lift it
with two people minimum and be careful not to
scratch it. Put eight bolts into it loosely. You'll need
to adjust the position both vertically and horizontally
to match the threshold of the ramp (or upper
landing) If you have a gate, put the gate-mount
brackets on the other side (or door if it doesn't have
a gate) and put install the pre-assembled gate.

Advertisement

Table of Contents
loading

Table of Contents