3.2 GW-2139M Utility
Please change the GW-2139M to initial mode and follow the following steps to set up the
communication between the utility and the GW-2139M.
Step0:
Power off the GW-2139M.
Step1:
Pin INIT Connect to GND and Power on to initial mode.
Step2:
Open Utiltity and click Start.
12
GW-2139M (Modbus TCP to BACnet MS/TP Gateway) User Manual
Version 1.0.0
Page:
Copyright © 2019 ICP DAS Co., Ltd. All Rights Reserved
E-mail: service@icpdas.com