Initial Start-Up; Mounting And Installation; Hose Mounting - Walther Systemtechnik VMS-05 Assembly Instructions Manual

Hand dosing valve
Table of Contents

Advertisement

Rev. 1.1

5 Initial Start-up

5.1 Mounting and Installation

Connect the VMS-05 Hand Dosing Valve with a pressured container or a pump via the material connection
(4). Connect the micro-switch (15) with a pilot valve (magnetic valve or time control or other). Adjust material
pressure at the pressured container or the pump (max. 20bar). When you now operate the micro-switch,
material will be discharged from the nozzle.
The VMS-05 Special Design valves can be installed in any position. The distance to the application area
depends on the desired application image.
An intermittent operation of the device will cause certain vibrations. Therefore make sure that the device is
safely and securely fixed and installed. The device comes with two borings of 5mm diameter in the valve
body which can be used for a solid installation. Try to avoid extremely large vibrations (transfer from
machines to valve).

5.2 Hose Mounting

Standard
Three functional hoses will connected as follows:
1.
Control air (black) to plug-in nipple (open 7 SA)
2.
Control air (black) to plug-in nipple (close 7 SZ)
3.
Material (transparent) to 1/4"-connection (4)
Special Design
Two functional hoses will be connected as follows:
1.
Control air to M5-connection (21.0.0)
2.
Material to 1/4"-connection (21.20)
Control air
Assembly Instructions - Full-Jet Valve VMS-05
Control air
open
Material
Control air
close
Material
Walther Systemtechnik GmbH – D 76726 Germersheim
Telefon: +49 (0)7274-7022-0 Telefax: +49 (0)7274-7022-91
http://www.walther-2000.de – info@walther-2000.de
Page 9 of 25

Advertisement

Table of Contents
loading

Table of Contents