gledhill benchmark BoilerMate A-Class OV Series Design, Installation And Servicing Instructions page 15

An open vented central heating and mains pressure hot water supply system
Table of Contents

Advertisement

���� ��������� ��� ����
���� ������� ����� �����
����
������
����
���� ��������� ��� ����
����
����
������
� � � �������
������� ����
�� �������
������� ������
� � � �������
������� ����
�� �������
������� ������
1.0 DESIGN
1.3 SYSTEM DETAILS
Heating System
Boiler sited above the BoilerMate
Any boiler used must be fitted with an overheat
thermostat i.e. it must be suitable for use in
a sealed system.
The F & E cistern must be fitted at a height
which will provide the minimum head required
for the boiler and must be at least 250mm
above the highest point of the system.
The height of the water level in the F & E cistern
from the base of the store should be no greater
than 10m.
A gravity check valve should be fitted in the
boiler return pipework to prevent gravity
circulation between the BoilerMate A-Class and
the boiler during dormant periods.
An automatic air vent will be required on the
flow adjacent to the boiler and depending
upon the pipe layout a manual air vent may also
be required on the return adjacent to the boiler
- see boiler installation insructions.
Boiler sited with dipped flow and return
pipes to the BoilerMate
Any boiler must be fitted with an overheat
thermostat i.e. it must be approved for use in
a sealed system.
An automatic air vent will be required on the
flow and return connections adjacent to the
boiler.
The height of the water level in the F & E cistern
must provide the minimum head required by
the boiler and must be at least 250mm above
the highest point of the system.
Page 15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents