Daikin GCU compact Series Installation And Operating Instructions Manual page 32

Table of Contents

Advertisement

4
Set-up and installation
Fig. 4-32
Connection diagram of the PCB jumpers and cable col-
ours of the factory-installed connection cables (for le-
gend, see
Tab.
4-3)
Installation and operating instructions
32
Connections of the PCB connectors:
J2
3UVB1
J3
AUX connection
J6
Mains connection
J8
Sensors, switching contacts
J9
FlowSensor (FLS1)
J12
3UV DHW
J13
CAN system bus
J14
Circulation pump P
J16
Room thermostat
Cable colours:
bl
Blue
br
Brown
ye
Yellow
gn
Green
n.b.
Contact not assigned
Mains voltage 230 V, 50 Hz
Tab. 4-3
Legend for
Fig. 4-32
INFORMATION
A detailed description of the individual connections can be
found in the
Chap.
12.6.
Fig. 4-33
Laying and securing cabling on the storage tank
14 Secure cables leading outdoors to the storage tank
15 Install the cable cover on the back of the controller housing
again.
Floor-standing gas condensing boiler with integrated heat storage
Z
(Fig.
4-33).
Gas Combi Unit
008.1543899_02 – 04/2019 – EN

Advertisement

Table of Contents
loading

Table of Contents