Daikin GCU compact Series Installation And Operating Instructions Manual page 31

Table of Contents

Advertisement

8
Guide the cables to the controller housing and remove the insu-
lation accordingly
Fig.
4-30.
Fig. 4-30
Cable guiding and strain relief
9
Effective strain relief in the controller housing by means of cable
ties must be ensured for all cables connected to the GCU com-
pact.
10 Check the holding force of the strain relief.
11 Open the front panel
(Fig.
4-31).
12 Insert the cables in the controller housing.
Gas Combi Unit
Floor-standing gas condensing boiler with integrated heat storage
008.1543899_02 – 04/2019 – EN
4
Fig. 4-31
Open the front panel, install the cabling in the controller
and establish the electrical connections
13 Lay the cabling in the controller housing
the electrical connections on the circuit board in accordance with
Fig. 4-32
and the subsequent sections in
Set-up and installation
(Fig.
4-31) and connect
Chap.
4.7.
Installation and operating instructions
31

Advertisement

Table of Contents
loading

Table of Contents