Polaris TRAIL BOSS 325 2001 Manual page 101

Table of Contents

Advertisement

CONNECTING ROD BEARING INSPECTION
1. Inspect bearing inserts for unusual wear, peeling,
scoring, damage etc. Replace as necessary.
NOTE: If one insert requires replacement, replace both
connecting rod bearing inserts as a set.
CONNECTING ROD BEARING CLEARANCE INSPECTION
1. Clean all oil from bearing inserts and crank pin.
2. Place a strip of Plastigauge
width of the crank pin.
3. Install the connecting rod and bearing cap in the
correct orientation.
4. Torque the rod nuts to specification.
Rod Nut Torque:
29-33 ft./lbs. (39-45 Nm)
5. Remove the bearing cap being careful not to
disturb the Plastigauge
6. Use the measuring scale on the Plastigauge
wrapper to measure the thickness of the
Plastigauge
. The rod must not turn during
this procedure.
NOTE:Use the widest part of the Plastigauge
termine the oil clearance.
Connecting Rod To Crankshaft Clearance:
Std: .0007-.0021 (.019-.053 mm)
Limit: .0026 (.065 mm)
7. If oil clearance is not within specification, install
new rod bearings and recheck the oil clearance.
8. If service limit is still exceeded, determine if the
crankshaft or connecting rod needs to be replaced
per Crankshaft Inspection and Connecting Rod
Inspection.
9. At completion of measurement procedure;
remove all traces of Plastigauge
and crankshaft.
across the complete
.
to de-
from bearing
ENGINE
3.45

Advertisement

Table of Contents
loading

Table of Contents