O & M Manual for the RLC1
Automatic Transfer Switch
Re-Transfer
Re-transfer is defined as a change of the load connection from the
Generator to the Utility.
Utility
Utility is the primary source (normal source, normal power source,
or normal).
Generator
Generator is the secondary source (generator emergency source,
emergency power source, emergency, standby, or backup
source).
Utility: Failed or Fails
Utility is defined as "failed" when it is outside of its undervoltage
setpoint ranges for the nominal voltage and frequency setting.
Table 1. ATS Catalog Number Explanation.
POSITIONS 1-2
Basic Device
Residential/Light Commercial RL
POSITION 8
POSITIONS 9-12
Number of Poles
Ampere Rating
Two 2
100 A – 0100
200 A – 0200
IB01602016E
POSITION 3
POSITION 4
Switching Device
Control Panel
Contactor C
ATC-100
POSITION 13
Voltage/Frequency
240 Vac/60 Hz
208 Vac/60 Hz
For more information visit: www.eaton.com
Generator: Failed or Fails
Generator is defined as "failed" when it is outside of its undervolt-
age/underfrequency/overfrequency (if applicable) setpoint ranges
for the nominal voltage and frequency setting for a time exceeding
0.5 seconds after the Time Delay Emergency Fail (TDEF) time
delay expires.
Transfer
Transfer is defined as a change of the load connection from the
Utility to the Generator power source.
Unconnected
Unconnected is defined as when the input is not shorted by an
external contact or connection.
POSITION 5-6
Switch Position
1
2 position
POSITION 14
Enclosure
W
NEMA 1
B
NEMA 3R
Instructional Booklet
Effective: March 2014
POSITION 7
Service Entrance
C2
Standard
Service Entrance
POSITION 15
Listing
S
UL Listed U
R
Page 5
X
E

Advertisement

loading