Commissioning; Initial Start-Up; Appliance Handover - STIEBEL ELTRON MINI-E 2-1 Operation And Installation

Thermostatic point-of-use tankless electric water heater
Hide thumbs Also See for MINI-E 2-1:
Table of Contents

Advertisement

Available languages

Available languages

COMMISSIONING

DANGER: Electrocution
The appliances are delivered with a power cable to be
connected to a permanent power supply.
Ensure that the proper wire gauge is installed with the
appliance in accordance with the minimum recommended
wire size in section 15.4, "Data table", pg. 20.
Material losses:
!
When making the connection to a standard wall socket,
ensure that the socket is freely accessible to be easily
disconnected in case of an issue.
Material losses:
!
Take note of the product label. The specified voltage must
match the mains voltage.
If the appliance is to be hardwired, connect the power cable as
shown in the wiring diagram (see 15.2, "Wiring diagram", pg.
18).
12
| MINI
-E SERIES TANKLESS ELECTRIC WATER HEATERS
11. Commissioning

11.1 Initial start-up

Before you activate the power supply, fill the appliance with
water first to avoid dry firing the heating element.
Check for leaks.
Activate the power supply.
Run the tap.
Check the function of the appliance.

11.2 Appliance handover

Explain the appliance function to users and familiarize them
with its operation.
Make users aware of potential dangers, especially the risk of
scalding.
Hand over these instructions.
WWW.STIEBEL-ELTRON-USA.COM

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mini-e 2.5-1Mini-e 6-2Mini-e 3-1Mini-e 3.5-1Mini-e 4-2

Table of Contents