Siemens SIMATIC PN/J1939 LINK Operating Instructions Manual page 26

Table of Contents

Advertisement

Functions
4.5 Control and status information
Dependence of the status of PN/J1939 LINK on the status of the PROFINET connection and the
status of the S7 controller
Event
PN/J1939 LINK has never been con-
nected to the S7 controller or has not
been configured since startup
S7 controller connected / not yet com-
pletely configured
S7 controller connected / completely
configured / no cyclic PROFINET data
exchange or data from the S7 control-
ler has IO provider status "Bad"
Cyclic PROFINET data exchange is
active and data from the S7 controller
has IO provider status "Good"
S7 controller changes to RUN
Disconnection of the S7 connection
(after PN/J1939 LINK has already
been configured once by the
S7 controller)
Reconfiguration by S7 controller
24
Reaction
PN/J1939 LINK state is "OFF"
PN/J1939 LINK receives the necessary configuration data
from the S7 controller.
For the "PGN input modules", the input data is preassigned
according to the parameter assignment.
PN/J1939 LINK state is "OFF"
PN/J1939 LINK state is "OFF"
PN/J1939 LINK takes the status according to the open loop
control bit ("OFF" or "ON"). The control bits are contained in
the cyclic data that come from the S7 controller.
PN/J1939 LINK takes the status according to the open loop
control bit ("OFF" or "ON"). The control bits are contained in
the cyclic data that come from the S7 controller.
PN/J1939 LINK state is "OFF"
PN/J1939 LINK receives the necessary configuration data
from the S7 controller.
For the "PGN input modules", the input data is preassigned
according to the parameter assignment.
PN/J1939 LINK state is "OFF"
Operating Instructions, 12/2018, A5E45307564-AA
SIMATIC PN/J1939 LINK