Daikin Maverick II MPS062E Installation And Maintenance Manual page 85

Commercial packaged rooftop system
Table of Contents

Advertisement

RF/EF Set-Up
RF/EF Ctrl= Tracking
MinExStrtTm= 120s
Rem RAF Cap= 5%
MinExStopTm= 120s
Rem ExhF Cap= 5%
MinExOAPos= 5%
BSP DB= 0.01in
MinExSAFCap= 10%
BSP Period= 5s
ExhOnOAPos= 40%
BSP Gain= 0.2s
ExhMxOAPos= 100%
Max Spd Chg= 4%
Exh Stg 1 On= 40%
Sup Fan Max= 100%
Exh Stg 1 Off= 30%
RF @ SF Max= 95%
Exh Stg 2 On= 55%
Sup Fan Min= 30%
Exh Stg 2 Off= 40%
RF @ SF Min= 25%
Exh Stg 3 On= 70%
Lo Fan Diff= 75%
Exh Stg 3 Off= 50%
Hi Fan Diff- 75%
Max RF/EF Hz= 60Hz
RFEF Ctrl Dly= 30s
Max Vent Spd= 100%
Min Speed=
Max RFEF RPM= 2600
5% (with Exhaust Fan)
ECM Status= _________
33% (with Return Fan)
Min OA Set-Up
CFM RESET
AplyMinOAChg= No (Uses
MinOAT Type Instance Name)
OA Flow= XXXXXCFM
Min OA Reset= None
MinOAFlwSpt= 2000CFM
BSPOAOvrd= No
Field Stn Rst= No
RstLmtSnsr= None
Field Stn Cfg= VDC
EXTERNAL RESET
Min CFM= 0 CFM
OA @ MinV/mA= 0%
Max CFM= 10000 CFM
OA @ MaxV/mA= 100%
V/A @Min CFM= 0.0/V
Min V/mA= 0.0/V
V/A @Max CFM= 10.0/V
Max V/mA= 10.0/V
OA CFM DB= 3%
CO
RESET
OA CFM Period= 30s
2
IAQ Reset= Yes
OA CFM Gain= 0.1
PPM@DCVLmt= 800PPM
OA CFM Max Chg= 5%
PPM@VntLmt= 1000PPM
Design Flow= Yes
IAQ PPM= XXXXPPM
Des Flo DB= 3%
Min PPM= 0 PPM
DF Period= 30s
Max PPM= 2000 PPM
Des Flo Gain= 0.1
V/A @Min PPM= 0.0/V
DF Max Chg= 5%
V/A @Max PPM= 10.0/V
RH Lvl Pos= ____________
LH Lvl Pos= ____________
www.DaikinApplied.com
Htg/Clg ChgOvr Set-Up
Cooling Set-Up
Ctlr Temp Src= RAT
Clg Stage Time= 5min
Clg DB= 2.0°F
AplyTstatchg= No
Use Tstat Spt= No
Clg Period= 20s
Clg Gain= 1
Occ Clg DB= 2.0°F
Clg Period= 60s
Clg PAT= 40s
CW Max Chg= 15%
Clg Gain= 0.1
Clg PAT= 600s
Clg Lo OAT Lk=
Max Clg Chg= 5.0°F
Occ Htg DB= 2.0°F
25°F (DPS or RTU w/
Htg Period= 60s
Htg Gain= 0.1
OAT Diff= 2.0°F
Htg PAT= 600s
Min EWT= 55°F
Max Htg Chg= 5.0°F
Clg Reset= None
CalDRemSpt@10°C= No
Min Clg Spt= 55.0°F
CalDRemSpt@50°F= No
Min Clg Spt @= 0/NA
CalDRemSpt@30°C= No
Max Clg Spt= 65.0°F
CalDRemSpt@86°F= No
Max Clg Spt@= 100/NA
DemandShed= Ena
Lead Circuit= #1
ClgDmdShdInc= 4°F
Staging Type= Std
HtgDmdShdInc= 4°F
CFanOut1 Spt= 55°F
ClgShedRate= 2.0°F/hr
CFanOut2 Spt= 65°F
HtgShedRate= 2.0°F/hr
CFanOut3 Spt= 75°F
Cond Fan Diff= 5°F
Unocc Diff= 3°F
DT Above Spt= ________
DT Below Spt= ________
FAN SPEED RESET
Min Fan Diff= 20%
Max Fan Diff= 50%
Min Clg Spd= 40%
Des Clg Spd= 100%
BSP RESET
MinRFEFTm= 120s
BSP OvdST= 5s
BSP OvdGain= 0.2
BSP OvdMaxChg= 4%
DAMPER LIMITING
RstTLmt= 32.0ºF
RstTSmplTm= 5s
RstTGain= 0.2
RstPAT= 60s
RstTMaxChg= 4%
0–30% OA Max= 30%
Min Inc Rate= 0.03
Max Inc Rate= 1.0
85
MicroTech III Controller Operation
55ºF (RTU/SCU)
0°F (MPS)
VFD Cmps)
IM 991-2 • MAVERICK II ROOFTOP

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents