Daikin Maverick II MPS062E Installation And Maintenance Manual page 117

Commercial packaged rooftop system
Table of Contents

Advertisement

Select Yes or No. If not applicable to the type of unit, select N/A.
X.
Have all electronic or electrical controls been checked, adjusted, and tested for proper operation per the installation and
maintenance bulletins?
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
XI. MAINTAINING MICROTECH CONTROL PARAMETER RECORDS
After the unit is checked, tested, and started and the final control parameters are set, record the final settings. Keep these records
on file and update whenever changes to the control parameters are made. Keeping a record facilitates any required analysis and
troubleshooting of the system operation and facilitates restoration after a controller replacement.
Thank you for completing this form. Please sign and date below.
Signature _____________________________________________________________
Return completed form by mail to:
Daikin Warranty Department, 13600 Industrial Park Boulevard, Minneapolis, MN 55441
or by email to:
AAH.Wty_WAR_forms@daikinapplied.com
Please fill out the Daikin Applied "Quality Assurance Survey Report" and list any additional comments that could affect the operation of this unit; e.g., shipping damage, failed
components, adverse installation applications, etc. If additional comment space is needed, write the comment(s) on a separate sheet, attach it to the Survey Report and return it to
the Warranty Department of Daikin Applied with the completed Equipment Warranty Registration form.
Submit Form
Clear Form
13F-4158 (06/17)
www.DaikinApplied.com
Rooftop Equipment Warranty Registration
Rooftop Equipment Warranty Registration Form (continued)
Startup date: ___________________________
117
No
N/A
IM 991-2 • MAVERICK II ROOFTOP
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents