Section 13
Control
WA1_QA1:
B1QOPEN/CLD = Position of TIE_QA1 breaker and belonging disconnectors
B2QOPEN/CLD = Position of WA2_QA1 breaker and belonging disconnectors
LN1QOPEN/CLD = Position of LINE1_QB9 disconnector
LN2QOPEN/CLD = Position of LINE2_QB9 disconnector
UB1OK/FF = Supervision of WA1_MCB fuse
UB2OK/FF = Supervision of WA2_MCB fuse
ULN1OK/FF = Supervision of LINE1_MCB fuse
ULN2OK/FF = Supervision of LINE2_MCB fuse
Setting
TIE_QA1:
B1QOPEN/CLD = Position of WA1_QA1 breaker and belonging disconnectors
B2QOPEN/CLD = Position of WA2_QA1 breaker and belonging disconnectors
LN1QOPEN/CLD = Position of LINE1_QB9 disconnector
LN2QOPEN/CLD = Position of LINE2_QB9 disconnector
UB1OK/FF = Supervision of WA1_MCB fuse
UB2OK/FF = Supervision of WA2_MCB fuse
ULN1OK/FF = Supervision of LINE1_MCB fuse
ULN2OK/FF = Supervision of LINE2_MCB fuse
Setting
WA2_QA1:
B1QOPEN/CLD = Position of WA1_QA1 breaker and belonging disconnectors
B2QOPEN/CLD = Position of TIE_QA1 breaker and belonging disconnectors
LN1QOPEN/CLD = Position of LINE1_QB9 disconnector
LN2QOPEN/CLD = Position of LINE2_QB9 disconnector
UB1OK/FF = Supervision of WA1_MCB fuse
UB2OK/FF = Supervision of WA2_MCB fuse
ULN1OK/FF = Supervision of LINE1_MCB fuse
ULN2OK/FF = Supervision of LINE2_MCB fuse
Setting
If only two SESRSYN functions are provided in the same IED, the connections and settings are
according to the SESRSYN functions for WA1_QA1 and TIE_QA1.
13.1.4

Setting guidelines

The setting parameters for the Synchronizing, synchrocheck and energizing check function
SESRSYN are set via the local HMI (LHMI) or PCM600.
This setting guidelines describes the settings of the SESRSYN function via the LHMI.
Common base IED value for primary voltage ( UBase ) is set in a Global base value function,
GBASVAL, found under Main menu//Configuration/Power system/GlobalBaseValue/
GBASVAL_X/UBase. The SESRSYN function has one setting for the bus reference voltage
GblBaseSelBus ) and one setting for the line reference voltage ( GblBaseSelLine ) which
(
independently of each other can be set to select one of the twelve GBASVAL functions used for
reference of base values. This means that the reference voltage of bus and line can be set to
different values. The settings for the SESRSYN function are found under Main menu/
Settings/IED Settings/Control/Synchronizing(25,SC/VC)/SESRSYN(25,SC/VC):X has been
divided into four different setting groups: General, Synchronizing, Synchrocheck and
Energizingcheck.
234
CBConfig = 1 1/2 bus CB
CBConfig = Tie CB
CBConfig = 1 1/2 bus alt. CB
1MRK 511 358-UEN A