Product Documentation; Product Documentation Set - ABB Relion REC670 Applications Manual

Bay control version 2.1 iec
Hide thumbs Also See for Relion REC670:
Table of Contents

Advertisement

Section 1
Introduction
1.3

Product documentation

1.3.1

Product documentation set

Engineering manual
Installation manual
Commissioning manual
Operation manual
Application manual
Technical manual
Communication
protocol manual
Cyber security
deployment guideline
IEC07000220 V4 EN-US
Figure 1:
The engineering manual contains instructions on how to engineer the IEDs using the various
tools available within the PCM600 software. The manual provides instructions on how to set
up a PCM600 project and insert IEDs to the project structure. The manual also recommends a
sequence for the engineering of protection and control functions, LHMI functions as well as
communication engineering for IEC 60870-5-103, IEC 61850, DNP3, LON and SPA.
The installation manual contains instructions on how to install the IED. The manual provides
procedures for mechanical and electrical installation. The chapters are organized in the
chronological order in which the IED should be installed.
The commissioning manual contains instructions on how to commission the IED. The manual
can also be used by system engineers and maintenance personnel for assistance during the
testing phase. The manual provides procedures for the checking of external circuitry and
energizing the IED, parameter setting and configuration as well as verifying settings by
secondary injection. The manual describes the process of testing an IED in a substation which
is not in service. The chapters are organized in the chronological order in which the IED should
be commissioned. The relevant procedures may be followed also during the service and
maintenance activities.
The operation manual contains instructions on how to operate the IED once it has been
commissioned. The manual provides instructions for the monitoring, controlling and setting of
the IED. The manual also describes how to identify disturbances and how to view calculated
and measured power grid data to determine the cause of a fault.
18
The intended use of manuals throughout the product lifecycle
1MRK 511 358-UEN A
GUID-3AA69EA6-F1D8-47C6-A8E6-562F29C67172 v15
IEC07000220-4-en.vsd
Application manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents